J. Tillman Group

J. Tillman GroupJ. Tillman GroupJ. Tillman Group

J. Tillman Group

J. Tillman GroupJ. Tillman GroupJ. Tillman Group
  • Home
  • Future Client
  • Get A Quote
  • About Us
  • Portfolio
    • Residential
    • Commercial
    • Equestrain
  • Territory
  • More
    • Home
    • Future Client
    • Get A Quote
    • About Us
    • Portfolio
      • Residential
      • Commercial
      • Equestrain
    • Territory
  • Home
  • Future Client
  • Get A Quote
  • About Us
  • Portfolio
    • Residential
    • Commercial
    • Equestrain
  • Territory

Eagles Bluff CC. Lake Frontage, Bullard, TX. Licensed & Insured Builder

Lake Palestine Vacant Lot. No trees or vegetation removed to date. 165' of seawall. .5 acre lot.
Geotechnical engineering, boring operations. Subsurface exploration, necessary for engineering
Geotechnical Engineering, Lake Palestine Lake Frontage lot. Slope stabilization engineering process
Geotechnical Bore Sampling. Lake Front Lot.
Steep Slope Excavation, Rough access  roadway for site operations.
Steep Slope Excavation, Carefully assuring slope slip mitigation.
Hillside slope stabilization retaining wall construction. Erosion control measures.
Aerial View - Foundation Push-out, Steep Slope Construction. Lake Palestine
Slope foundation excavation, Benching hillside to prevent collapse. Lightest color is concreted sand
Footer Installation, #5 rebar grid 12" o.c., Vertical #5 rebar 12" o.c.
Footer's poured. Lowest downhill walls extend 8' into undisturbed soil. Locked in to Concreted Sand.
Foundation Forming 20' tall wall included in this residential foundation
Wall forms installation, #5 rebar - 12" grid,
Foundation forms braced for concrete pour.
Foundation concrete pour. Pumping concrete and vibrating concrete to remove air pockets.
Hillside residential foundation. The day forms are stripped.
Foundation forms stripped, Lowest wall extends 8' below subsurface, channeled into concreted sand.
French Drain System, Footer Drainage. Wrapping drain like a burrito keeping out unwanted silt & snd
Footer drain system completely wrapped in Mirfi fabric.  Dimple matt on foundation for water channel
Vapor barrier under slab. Termite mitigation to ground surface under vapor barrier applied.
Show More
  • Home
  • Future Client
  • Get A Quote
  • Territory
  • Contact

J. Tillman Group

Lake Palestine - Bullard, Texas, United States

(903)--316-6033

Copyright © 2025 J. Tillman Group - All Rights Reserved.

Powered by

This website uses 'Basic Analytics Only' cookies.

We use cookies to analyze website traffic and optimize our website. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept